EIA of the project «Reconstruction of hydraulic structures of the tailings facility and circulating water supply of JSC «Marganets Mining and Processing Plant»
EIA of the project «Reconstruction of hydraulic structures of the tailings facility and circulating water supply of JSC «Marganets Mining and Processing Plant»
EIA of the project "Reconstruction of the "Tsentralna" boiler house with the installation of a cogeneration gas piston unit"
EIA of the project «Construction of a closed irrigation network for agricultural crops»
EIA of the project "Reconstruction of a minimarket with a cafeteria into a multi-fuel gas station complex"
EIA of the project "New construction of an irrigation system for agricultural land outside the settlement"
EIA of the project "New construction of an irrigation system"
EIA of the project "New construction of a melioration system"
EIA of the project "Water supply using mobile pumping stations on canal 3 MK (PK98+80) of the North-Rogachyk irrigation system with waters from the Kakhovka reservoir"
EIA of the project "New construction of a melioration system"
EIA of the project "Construction of a 1000 m3 RVS tank at the Pasichna group collection point"
EIA of the project "Construction of a production and warehouse complex (food production plant)"
EIA of the project "Construction of a multifunctional residential complex with multi-apartment residential buildings of 4-5 floors with underground parking and a kindergarten-school"
EIA of the project «New construction of residential and public complexes»
EIA of the project "Reconstruction of a gas station into a gas station complex with the installation of LPG equipment"
EIA of the project "Carrying out economic activities related to hazardous waste management, namely: collection, transportation, storage, treatment at the industrial site"
EIA of the project "Placement of the DS-50B soil mixing plant and the MARINI TOP TOWER 3000 mobile asphalt concrete plant for the production of asphalt concrete mixtures used in the construction and repair of highways"
EIA of the project "Liquidation of the Separate Subdivision "Velykomostivska Mine" of SE "Lvivvuhillia"
EIA of the project "Placement of a mobile asphalt concrete plant MARINI TOP TOWER 3000 and a soil mixing plant DS-50B for the production of asphalt concrete mixtures used in the construction and repair of highways"
EIA of the project "Placement of the MARINI BETOWER ECO 2000R mobile asphalt concrete plant and the DS-50B soil mixing plant for the production of asphalt concrete mixtures used in the construction and repair of highways"
EIA of the project "Construction of an irrigation network pipeline to increase water supply to the irrigation area"
EIA of the project "Reconstruction of the extraction shop and adjacent area"
EIA of the project "Reconstruction of the elevator complex 120 thousand tons"
EIA of the project "Reconstruction of shipping lines for water transport at elevator complexes"
EIA of the project "Acquisition and placement (installation) of a backup power source for a gas piston cogeneration unit of container type on the territory of the central heating boiler house"
EIA of the project "New construction of a closed irrigation network for agricultural crops"
EIA of the project "New construction of a melioration system for irrigation of agricultural crops"
EIA of the project "Construction of a melioration system"
EIA of the project "Construction of a reclamation system"
EIA of the project "New construction of a melioration system"
EIA of the project "New construction of a melioration system"
EIA of the project "New construction of a melioration system"
EIA of the project "New construction of an irrigation system"
EIA of the project "Placement of the mobile asphalt concrete plant MARINI BETOWER ECO 2000R and soil mixing plant MARINI COLDFALT 400 for the production of asphalt concrete mixtures used in the construction and repair of highways"
EIA of the project "Development of Skovyatin gypsum deposit in Chortkiv district of Ternopil region"
EIA of the project "Reconstruction of an existing gas station into a multi-fuel gas station with the installation of equipment for liquefied petroleum gas"
EIA of the project "Technical re-equipment of internal technological networks and equipment on the territory of the operating enterprise DANONE DNIPRO LLC"
EIA of the project «Reconstruction with expansion of the irrigation network of pumping station No. 41 of the Ivanivka MUWG GMCC with the aim of installing an additional circular sprinkler machine»
EIA of the project «Reconstruction with expansion of the irrigation network of pumping station No. 7 R-5-1 of Henichesk UVG with the aim of installing two additional circular irrigation machines and replacing the existing frontal irrigation machine with a circular irrigation machine»
EIA of the project "Reconstruction of the oil extraction plant of KF LLC «AT Cargill» for seasonal processing of 1100 tons of rapeseed per day for the production of rapeseed oil."
EIA of the project "Extraction of groundwater from well No. 151 for production needs"
EIA of the project «Construction of an oilseed cleaning unit for feeding into silos for receiving and processing oilseeds on the territory of the Kakhovka branch of Cargill AT LLC»
EIA of the project «Extraction of thermal mineral waters from well No. 38 (7-743T) of the "Strelkovskoye" deposit of mineral medicinal waters»
EIA of the project "Extraction of drinking groundwater from the "Holoprystanske Dzherelo" deposit"
EIA of the project "Reconstruction of the grain handling complex"
EIA of the project "Storage of hydrocarbon raw materials (fuel oil and petroleum bitumen) on the complex territory"
EIA of the project "New construction of an on-farm complex for processing and storage of agricultural products "Zakhidny" (Western)"
EIA of the project "Development of Bilokrynytske limestone deposit (main section)"
EIA of the project «Placement of the DS-50B soil mixing plant and the MARINI TOP TOWER 3000 mobile asphalt concrete plant for the production of asphalt concrete mixtures used in the construction and repair of roads»
EIA of the project "Construction of a drip irrigation system for growing tomatoes"
EIA of the project «Reconstruction of the warehouse for diesel fuel transshipment»
EIA of the project «Reconstruction of the grain handling complex, in terms of increasing the capacity for receiving, processing, storing and shipping grain»
EIA of the project "Development and reclamation of the Arkhangelsk limestone deposit and the eastern section of the Arkhangelsk limestone deposit"
EIA of the project «Construction of a closed irrigation network»
EIA of the project "Limestone extraction at the Zaporizhzhia deposit of the Davydiv-Brid village council of Velyka Oleksandrivka district"
EIA of the project "Restoration of the sanitary-ecological and hydrological state of the Verevchyna and Kosheva reservoirs near Domobudivelna Street in Kherson with the arrangement of the coastal protective strip"
EIA of the project «Improvement of the sanitary and ecological condition of a part of Utliuk Estuary and landscaping of the coastal zone adjacent to Shchaslyvtseve village and Henicheska Hirka village»
EIA of the project "Reconstruction of a non-residential building, which is a complex of buildings and structures, into a complex of buildings and structures for storing mineral fertilizers with the construction of a warehouse"
EIA of the project "Construction of additional on-site tracks and an oil loading station on the territory of the Kakhovka branch"
EIA of the project "Reconstruction of an automobile service center into a multifunctional gas station complex"
EIA of the project "Construction of a grain elevator with a simultaneous storage capacity of 30,000 tons"
We work with clients in all regions of Ukraine, from private businessmen to multinational companies in all sectors of the economy, developing them in the direction of strategic environmental management.
Among our clients, over 20% are from Forbes Ukraine. We also work with mid-sized companies, helping them accelerate growth and achieve their aspiration for market leadership. We advise government and public organizations. Our work is aimed at helping communities raise awareness of environmental protection, improve the ecological situation in our communities, and improve the lives of Ukrainian citizens.
Our goal at EMGROUP is to build a better world around us. We start by asking more precise questions: questions that challenge, inspire, and open up new answers to some of today's most pressing problems.
We believe that every environmental audit, every waste declaration, every consulting opportunity, and every interaction with a client or colleague should leave our world better than it was before. Achieving this goal begins with asking more precise questions, because the better the question, the better the answer. These more precise answers help our clients operate more efficiently, manage risks, foster growth, and instill confidence, ultimately leading to a better world.